FindOwnerSearch
Brands and Their Owners
Welcome to the Brand page for “CRITICAL PATH E V M”, which is offered here for The mark consists of a rectangular box frames the following: on the left side of the large framing rectangular box is a square that is colored in completely; in the center is a contrasting lighter image. the image is a right angle that points towards the bottom right of the inner square. three jagged lines progress from the left of the bottom line to the top of the upright line signifying a graph with three lines, each progressing upwards over the last. the right section has the words critical path on the top center and the letters evm spread out beneath. the words are a darker contrast to the background.;computer software for earned value data graphing and reporting capabilities;color is not claimed as a feature of the mark.;critical path evm;.
Its status is currently believed to be active. Its class is unavailable. “CRITICAL PATH E V M” is believed to be currently owned by “VSD, LLC”.
| Owner: |
VSD, LLC
Owner Details |
|---|---|
| Description: |
The mark consists of a rectangular box frames the following: on the left side of the large framing rectangular box is a square that is colored in completely; in the center is a contrasting lighter image. The image is a right angle that points towards the bottom right of the inner square. Three jagged lines progress from the left of the bottom line to the top of the upright line signifying a graph with three lines, each progressing upwards over the last. The right section has the words Critical Path on the top center and the letters EVM spread out beneath. The words are a darker contrast to the background.;Computer software for Earned Value data graphing and reporting capabilities;Color is not claimed as a feature of the mark.;CRITICAL PATH EVM;
|
| Categories: |