Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 152

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 469

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 474

Notice: Undefined variable: type in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 560

Notice: Undefined variable: sortString in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 563
WORK GLORY

WORK GLORY

Brand Owner Address Description
WORKGLORY Zhejiang Bestsuppliers Network Technology Co., Ltd. Rm 501-2,35 Unit 2,1218 West Wen Yi Rd Cang Qian Street,Yuhang District Hangzhou,Zhejiang 311121 China WORK GLORY;Buckets; mops; cleaning brushes for household use; cooking utensils, namely, grills; disposable aluminum foil containers for household purposes; drinking straws; foldable bath tubs for babies; frying pans; ironing boards; lunch boxes; pet waste management kits comprising scoops for pet waste disposal, plastic bags and liners, and portable dispensers for plastic bags and liners sold as a unit; sprinklers for watering flowers and plants; trash cans; trays for household purposes; vacuum flasks; vaporizers being electric aromatic oil diffusers; window cleaners in the nature of a combination squeegee and scrubber; automatic pet feeders; fitted picnic baskets; non-electric fruit squeezers;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A computer implemented method and system for enterprise wide planning is disclosed. In an embodiment, one or more work card templates are initially defined. Then a plurality of work cards representing a project are received and compared with the work card templates. Scheduling parameters from the work card templates are added to the matching work cards. Then, expected non-routine work cards are added to the work cards. Next, the expected non-routing work cards and the operational work cards are scheduled.