ON WORK

Brand Owner (click to sort) Address Description
ONTOWORK UltraConcurrent, Inc. Box 880 Aptos CA 95001 ON TO WORK;Comparison shopping services; Dissemination of advertising for others via the Internet; On-line advertising and marketing services; Providing consumer product information via the Internet; Providing on-line directory information services also featuring hyperlinks to other web sites;
ONWORK Wang Yi 4/F, Bldg B, Minlida Industrial Bldg Liuxian Avenue, Nanshan Dist Shenzhen 518000 China ON WORK;The wording ONWORK has no meaning in a foreign language.;Automatic faucets; Bath installations; Baths, bathtubs, whirlpool baths and bath installations; Clean room installations; Fairy lights for festive decoration; Faucets for pipes and pipelines being parts of sanitary installations; Filtering units for water filtering, producing potable water for domestic use; Flashing strobe light apparatus; Humidifiers; Hydroponics grow box in the nature of a closed environment equipped with lights, exhaust system, hydroponics growing container and odor control system; LED (light emitting diode) lighting fixtures; LED lamps; Luminaries; Portable electric warm air dryer; Sanitizing apparatus using ultraviolet light for sanitizing linens, surfaces of objects not for medical purposes; Showerheads and components thereof; Toilet bowls; Water filters; Water purification, sedimentation and filtration apparatus for clarification, thickening and filtration of water, waste water and industrial water;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A computer implemented method and system for enterprise wide planning is disclosed. In an embodiment, one or more work card templates are initially defined. Then a plurality of work cards representing a project are received and compared with the work card templates. Scheduling parameters from the work card templates are added to the matching work cards. Then, expected non-routine work cards are added to the work cards. Next, the expected non-routing work cards and the operational work cards are scheduled.