Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 152

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 469

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 474

Notice: Undefined variable: type in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 560

Notice: Undefined variable: sortString in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 563
NAME E BOLE DOES

NAME E BOLE DOES

Brand Owner Address Description
E. BOLE' SAN FELIPE TRADING CO., INC. Apartado -P.O. Box 8799 Panama 5 Panama The name E. BOLE' does not identify a living individual.;lingerie, namely, brassieres, panties, slips and shifts;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A construction process for the composite pile foundation which consists of the expanded belled base and the pile shaft, the construction process comprising the steps of: a) Aligning the pile tip at the pile location and place the casing at the top of the pile tip; b) Lifting the heavy hammer to enter the casing, repeatedly lift the heavy hammer to reach the given height and back press the casing, let it fall freely to ram the pile tip and the soil until a hole forms at the pile location; c) Lifting the heavy hammer higher than the feed inlet of the casing and fill solid material from the inlet into the casing; d) Ramming the above-mentioned solid material and repeat the filling and ramming operations; e) Controlling the penetration of the last three blows; f) Filling graded aggregate or stiff consistency concrete and repeatedly ram it to form the expanded belled base; g) pull out the casing; h) Aligning the pile shaft at the pile hole and repeatedly back press and blow slightly with the heavy hammer to drive the pile shaft into the pile bole and fix and connect it with the expanded belled base; i) Controlling the penetration of the last three bouts and form the pile. The invention offers the advantages of high bearing capacity, small settlement, short pile shaft, low engineering cost, simple construction, short construction period, easy quality control etc.