MAPS DEPICTING COSTS SCHEDULE

Brand Owner Address Description
FRONTIER MAPS Project Frontier Suite 800 415 S. Boston Tulsa OK 74103 Maps depicting costs and schedule performance;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A non-blocking optical matrix core switching method that includes maintaining a schedule for routing data through an optical matrix core and receiving and analyzing reports from peripheral devices. The method determines whether the schedule is adequate for the current data traffic patterns and if the schedule is not adequate a new schedule is implemented. The new schedule is then transferred to the peripheral devices for implementation and the new schedule is transferred to the optical matrix core scheduler. Implementation of the new schedule as the schedule on the peripheral devices and the optical matrix core scheduler is then performed.