Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 152

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 469

Notice: Undefined property: stdClass::$live in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 474

Notice: Undefined variable: type in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 560

Notice: Undefined variable: sortString in /home/uchis2/domains/uchisearch.com/public_html/category.php on line 563
ENGINEERING WORK or ENGINEERING WORKS

ENGINEERING WORK

Brand Owner Address Description
AAQIUS Aaqius & Aaqius SA Rue de la Coulouvrenière 19 Genève CH1204 Switzerland Engineering work; technical consulting relating to technical and scientific analysis in the fields of low-carbon and zero-carbon green technology, green energy, and green transportation; drafting of construction plans for green buildings; technical project studies, namely, conducting feasibility studies in the fields of low-carbon and zero-carbon green technology, green energy, and green transportation; industrial research and development in the fields of low-carbon and zero-carbon green technology, green energy, and green transportation; conducting scientific studies in the fields of low-carbon and zero-carbon green technology, green energy, and green transportation and in the field of engineering work;
 

Where the owner name is not linked, that owner no longer owns the brand

   
Technical Examples
  1. A computer implemented method and system for enterprise wide planning is disclosed. In an embodiment, one or more work card templates are initially defined. Then a plurality of work cards representing a project are received and compared with the work card templates. Scheduling parameters from the work card templates are added to the matching work cards. Then, expected non-routine work cards are added to the work cards. Next, the expected non-routing work cards and the operational work cards are scheduled.